Every moving process, regardless of its motivation, has a high degree of criticality, requiring adequate planning of time, budget and professional needs to ensure the success of the project.

Big Blue is completely capable to mitigate all the risks involved in a Migration Project, given the immense experience gained in hundreds of projects carried out during its existence, guaranteeing the transition in a safe way, through its carefully designed processes.

Project Phases

• Assessment
• Planning
• Validation
• Execution
• Support, Adjustment and Documentation

Phiysical Moving Phases

• Assessment e planning
• Site Survey: sites of basis and destination
• Workshops, alignments and technical validations
• Inventory and identification of IT assets (Hardware, Software, Applications and Database)
• Creation of the Bay Face of origin and destination
• Analysis of risks and improvements.
• Infrastructure preparation and checking in the target environment
• Disconnection and disassembly
• Transportation (with or without armed escort)
• Assembly, connection and turn on
• Testing of the new environment
• Post moving support